Laptop Guidelines and Goods Documentation
Last updated: September 26, 2026 (Original publication date: May 5, 2025)
The Laptop Guidelines and Goods (LGG) is a policy established by United Metrolite Central. This policy outlines guidelines for workers and employees who have purchased new laptops. Adherence to the applicable requirements and understanding of the policy are mandatory.
Identify Eligible Laptop Models
Check the list of TKDN-compliant laptop goods or imported laptops that meet UMC standards.
Verify the model name and brand before proceeding.
Gather Required Information
Prepare required details such as laptop specifications and the owner's name.
Do NOT share unnecessary personal information. Provide personal information only when required by the official approval process.
Complete the UMC Approval Team Form
Access the official approval form here: https://forms.gle/PytPdqgeKCDEoHEE6
The form is available but remains a work in progress.
Complete all required fields, including the laptop model and other relevant information.
Submit the Completed Form
Submit the completed form to the UMC Department of Approvals for processing.
Receive Confirmation
After submission and review, applicants will receive confirmation of whether the request has been approved or denied.
Note: The approval team normally reviews submitted information within 5–7 business days. Only information required for the approval process should be submitted. Avoid providing unnecessary sensitive information.
New for September 2026: Battery Acceptance Testing
Replacement laptop batteries must undergo appropriate acceptance testing before the device is returned to normal daily service.
Testing must include battery identification and observation of State of Charge (SOC) behavior during normal charging and discharging. Previously documented battery faults, including unexpected percentage jumps, should be treated as regression-test conditions for replacement batteries.
A replacement battery must not be considered validated merely because it reaches 100% charge. Stable SOC progression, particularly at low charge levels, is an important acceptance criterion.
Battery testing should normally be performed on a hard, stable, and properly ventilated surface. Charging irregularities occurring while ventilation is obstructed or the laptop is unusually hot must be investigated separately before being classified as battery defects.
The September 26, 2026 test of the replacement LNV-01AV448 in the ThinkPad L15 Gen 2 demonstrated this procedure. During repeated charging and discharging observations, including operation from 100% to approximately 7% SOC, the previously observed percentage-jump fault was not reproduced.
The replacement therefore passed the primary SOC-jump regression condition, and the laptop was returned to normal service operation.
Key Lesson: A replacement battery should be tested against previously observed failure modes. Successful charging alone is insufficient evidence of correct SOC behavior.